Tuesday, June 14, 2011

#WallowFire GACC Detailed Situation Report from 6/13/2011 flyover 1700hrs

#WallowFire GACC Detailed Situation Report from 6/13/2011  1700hrs
Acreage:  452,155
See details below


Overhead Team Name: Dugger HughesOrganization: Type 1 TeamLocal:GACC:
Size:
452,155 ACRES
% Cnt/MMA:
20 %
Est Contain:
NR
Latitude:
33° 36´ 7"
Longitude:
109° 26´ 56"
Location: 23 miles SW of Alpine, AZ$$ Costs to Date: $3,888,042
Structures Threatened: 14 PRIM , 23 COMM , 16 OUTBStructures Destroyed: NONE
Resources Committed:Total Personnel: 881Report Date: Jun 13, 2011 1700
AgencyCRW1CRW2HEL1HEL2HEL3ENGSOVHD
BIA15000216
BLM0000047
FWS0000011
NPS0000013
OTHR00000017
PRI0400240
ST01000948
USFS492202445
WXW0000002
Significant Events: Fire actively backed in Divisions KK, Z and Y to locations where air resources were utilized to slow the southward progression in order to complete indirect line construction and continuing preparation of the secondary containment lines. Fire intensity lessened on Divisions C, A and B from previous firing operations allowing crews to patrol and mop-up. Rehab of handline and dozer line began in Division D.Remarks: The IHCs assigned are needed for at least 2 additional shifts to prepare for and conduct firing operations in Branch 12. They are needed to be line spike capabale due to the terrain of the area and complexity of the planned firing operations. The plan exceeds the capability of other crew types. Timelines for these operations falls within the remaining assignment length without the needed for extensions.
Observed Fire Behavior: In Branch 12, active backing fire was observed in the timber until locations where wind and available fuels aligned to establish uphill runs. In Branches 10 and 11, interior islands of unburned mixed conifer displayed group tree torching.
Planned Actions: Completion of the indirect and secondary containment lines by IHCs in Divisions Z, Y and KK. Divisions A, B, C and D will patrol and mop-up. Resources in the Sunrise Structure Protection Group will continue to provide the structure preparation necessary.


Wallow Zone 1AZ-ASF-110152-1Type: WFStart: 05/29/2011 1330Cause: UPriority:
Overhead Team Name: Joe ReinarzOrganization: Type 1 TeamLocal:GACC:
Size:
452,155 ACRES
% Cnt/MMA:
15 %
Est Contain:
NR
Latitude:
33° 36´ 7"
Longitude:
109° 26´ 56"
Location: Alpine, AZ$$ Costs to Date: $26,055,425
Structures Threatened: 2,500 PRIM , 400 COMM , 1,000 OUTBStructures Destroyed: 32 PRIM , 36 OUTB
Resources Committed:Total Personnel: 2,379Report Date: Jun 13, 2011 1700
AgencyCRW1CRW2HEL1HEL2HEL3ENGSOVHD
BIA17000331
BLM210001637
DDQ0000002
FWS0000019
IA0000001
LGR0000001
NPS00000214
PRI08632716
ST030009489
USFS91700056221
WXW0000002
Significant Events: Active fire north of Alpine. Spotting picked up in Div. J by Turner Peak. Spotting picked up around Big Lake recreation area. RH values at 3% in Alpine and 2% in Reserve. 1 cabin confirmed destroyed at Pool Corral.Remarks:
Observed Fire Behavior: Interior activity of isolated torching and sustained runs when influenced by wind or terrain. Spotting on the east side due to high winds. High consumption of heavy fuels.
Planned Actions: Continue securing communities already impacted by fire. Maintain perimeter control by mopping up 300' into the black. Continue hazard tree falling around communities and vital access roads. Begin rehab assessment for suppression efforts.


Wallow SWACAZ-ASF-110152-SWACType: WFStart: 05/29/2011 1330Cause: UPriority:
Overhead Team Name: Jim LoachOrganization: Area CommandLocal:GACC:
Size:
452,155 ACRES
% Cnt/MMA:
18 %
Est Contain:
NR
Latitude:
33° 36´ 7"
Longitude:
109° 26´ 56"
Location: 23 miles southwest of Alpine, AZ$$ Costs to Date: $31,743,467
Structures Threatened: 2,714 PRIM , 473 COMM , 1,216 OUTBStructures Destroyed: 32 PRIM , 4 COMM , 36 OUTB
Resources Committed:Total Personnel: 4,734Report Date: Jun 13, 2011 2000
AgencyCRW1CRW2HEL1HEL2HEL3ENGSOVHD
BIA315000785
BLM250002046
CNTY0000000
FWS01000412
NPS00000621
OTHR000003475
PRI0139652823
ST04000110159
USFS1939000124430
WXW0000005
Significant Events: Active fire north of Alpine. Spotting picked up near Turner Peak and Big Lake Campground. See individual Zone 209s for more detailed information.Remarks: Structure destroyed shown in Block 24 was a cabin that was confirmed destroyed at Pool Corral in Zone 1. Type 1 IHC crews remain a critical resource for Southwest Area Command. Acres by ownership are as follows: USFS - 420,638 ac. Private- 6,334 ac. State of Arizona - 4,233 ac. San Carlos Indian Reservation - 8,027 ac. Ft. Apache Indian Reservation - 12,923 ac.
Observed Fire Behavior: Increased winds resulted in increased fire activity including interior crown runs with moderate-range spotting where winds and topography were aligned. See individual Zone 209s for additional detail.
Planned Actions: Continue to secure communities and mopping up and falling hazard trees in Zone 1. Continue structure protection, securing control lines and scouting new control line locations to the south in Zone 2. Continue holding, patroling and mopping up as well as conducting firing operations to tie direct and indirect line in Zone 3. See individual Zone 209s for additional detail.



Wallow Zone 2AZ-ASF-110152-2Type: WFStart: 05/29/2011 1330Cause: UPriority:
Overhead Team Name: Jeff PendletonOrganization: Type 1 TeamLocal:GACC:
Size:
452,000 ACRES
% Cnt/MMA:
20 %
Est Contain:
NR
Latitude:
33° 36´ 7"
Longitude:
109° 26´ 56"
Location: Alpine, Arizona$$ Costs to Date: $1,800,000
Structures Threatened: 200 PRIM , 50 COMM , 200 OUTBStructures Destroyed: NONE
Resources Committed:Total Personnel: 1,474Report Date: Jun 13, 2011 1600
AgencyCRW1CRW2HEL1HEL2HEL3ENGSOVHD
BIA13000238
BLM040001639
FWS0100022
NPS0000034
OTHR000001821
PRI01402177
ST00000722
USFS61300044160
WXW0000001
Significant Events: Completion of burnout in Divisions 2BV and 2V.Remarks:
Observed Fire Behavior: Increased winds have resulted in an increase in fire activity with surface fire spread with occasional torching and short range spotting.
Planned Actions: Structure protection, continue to strengthen and secure lines, scout out line locations to meet control objectives.

No comments: